Breaking the Bottleneck: Unlocking the Grid’s Potential with Energy Storage
Time: 12:20 - 12:35
Date: 19/02/2025
Synopsis
- The Bottlenecks of Traditional Energy Programs: We’ll identify the challenges associated with integrating renewable energy sources, managing peak demand and maintaining power quality
- Unlocking Potential with BESS: Discover how well-designed and optimized BESS can address these challenges by storing excess renewable energy, smoothing peak demand periods and providing grid stability
- Best Practices for BESS Design: Learn key considerations for designing and implementing effective BESS solutions, including system sizing, application-specific optimization and integration with existing grid infrastructure
Speaker
- Bud Collins CEO - AESI
« Back